Monday, August 25, 2014

Vacuum Body (Compressor)

How to replace the compressor after the compressor was replaced with a new one we are checking in advance whether the compressor has been installed is not deadlocked (jams, clogged), check high press and low press her. Having ascertained that the AC compressor has been installed to function properly then we connect the outdoor unit with the AC pipe Pulve treeway to small and large. Prepare Tube for R22 refrigerant freon charging, freon fill before doing vacuum compressor with the engine vacuum or a vacuum can also manually commonly called the vacuum body, vacuum body only done for half the size of the split AC PK ~ 2 PKjika Ac above 2PK use a vacuum machine for maximum results. 
Here is how the vacuum body (vacuum compressor): 
1 Attach the blue hose on the nipple and freon charging hose yellow on freon tube (second position on the manifold valves fully closed). 
2 Open the faucet cover nepel (large pipe) which is on the right side of the outdoor unit nepel faucet. 
3 Put the L key on the faucet (large pipe) and turn to the right (nepel closed valve position). 
4 Operate split air conditioners and wait until the outdoor gets power supply from the indoor unit. 
5. after the outdoor unit operation, disconnect the hose from the manifold blue, wind / air that is in the pipeline and the compressor will come out of the blue end of the hose and wait until the wind does not come out again (run out) 
6 When there is no wind / air coming out of the blue end of the hose, replace the blue end of the hose to the manifold, then turn the key to the left of L which is at 3/8 nepel faucet (faucet nepel fully open position). 
7 contents by turning the faucet manifold freon blue needle towards the left while looking to make sure how much freon manifold which has entered into the cooling system / ac split. at the time of filling the freon do it gradually not all at once in a short time, so as not to damage the valve compressor.Lihat page by filling freon air conditioning compressor vacuum Perform split up the numbers on the gauge manifold minus 30 (-30) takes approximately 30 minutes.

No comments:

Post a Comment